Mapleglobal

Route surveys & safety compliance

  • Home
  • Route surveys & safety compliance

Route surveys & safety compliance

About Our Route surveys & safety compliance

At MapleGlobal, we ensure every heavy, oversized, or sensitive shipment moves safely by conducting detailed route surveys and implementing strict safety compliance procedures. Our expert team assesses the entire transportation path—identifying obstacles, risks, and operational requirements to guarantee a smooth, secure, and legally compliant movement.

From analyzing road conditions to coordinating with authorities for permissions, we take a proactive, engineering-focused approach. Our advanced planning minimizes delays, prevents damage, and ensures that every shipment meets national and international safety regulations.

Key Highlights:

  • Comprehensive pre-movement route surveys

  • Evaluation of road width, gradients, bridges & overhead clearances

  • Risk assessment and feasibility analysis

  • Safety planning and traffic management

  • Coordination with local authorities for permits & escorts

  • Compliance with ODC/OOG transport regulations

  • Preventive planning to avoid delays and operational risks

With MapleGlobal, your cargo travels on a route that is planned, tested, and secured—ensuring a safe journey from origin to destination.

Frequently Asked Question

What exactly is a route survey, and why is it necessary?

A route survey is an in-depth assessment of the planned transportation path used to move heavy, oversized, or sensitive cargo. It involves analyzing road infrastructure, identifying potential obstacles, evaluating safety risks, and planning the best possible route. This process is essential to ensure safe transit, prevent accidents, avoid structural damage to roads or bridges, and comply with government regulations for Over-Dimensional Cargo (ODC) movement.

Our team performs a comprehensive evaluation that includes:

  • Road width, shoulder conditions, and pavement quality

  • Bridge load capacity and structural integrity

  • Height clearances for overhead cables, signboards, and trees

  • Road curves, gradients, slopes, and turning radius feasibility

  • Traffic patterns during peak and non-peak hours

  • Condition of culverts, embankments, and narrow passages

  • Feasibility of bypass routes, diversions, or alternative paths
    This detailed study ensures that every inch of the route is safe for your cargo.

Yes. MapleGlobal provides trained escort vehicles (pilot cars) to guide the transport vehicle throughout the journey. We also have on-ground supervisors, engineers, and safety officers who monitor the cargo movement to ensure strict compliance with operational and safety standards.

If any part of the route is identified as unsafe—due to low bridge clearance, weak infrastructure, sharp turns, or other obstacles—we design an alternate route plan. Our experts may also coordinate temporary solutions, such as:

  • Lifting overhead wires

  • Reinforcing weak bridges

  • Pruning roadside trees

  • Temporarily blocking traffic for safe maneuvering
    We ensure the final route is completely viable for transport.

The duration can vary depending on route length, complexity, weather conditions, and the type of cargo being moved. On average, route surveys can take anywhere from a few hours to several days. MapleGlobal prioritizes quick and accurate execution to avoid project delays.

By identifying risks before movement, we ensure preventive actions such as adjusting speed limits, reinforcing load securing methods, scheduling movement during low-traffic hours, and preparing contingency plans. This reduces operational risks, minimizes delays, and ensures the highest level of safety.